000 | 00934cam a2200253 a 4500 | ||
---|---|---|---|
001 | vtls000112106 | ||
003 | VRT | ||
005 | 20250102224027.0 | ||
008 | 140810s2013 enka b 001 0 eng | ||
020 | _a9780415629133 | ||
039 | 9 |
_a202210311018 _baalzain _y201408101147 _zaalzain |
|
050 |
_aTA682.26 _b.P68 2013 |
||
100 | 1 |
_aPotts, Keith F. _934207 |
|
245 | 1 | 0 |
_aConstruction cost management : _blearning from case studies / _cKeith Potts, Nii Ankrah. |
260 |
_aLondon: _bRoutledge, _c2008. |
||
300 |
_axix, 363 p. : _bill. ; _c26 cm. |
||
504 | _aIncludes bibliographical references and index. | ||
650 | 0 |
_aConstruction industry _x-- Costs. _934208 |
|
650 | 0 |
_aConstruction industry _x-- Cost control. _934209 |
|
650 | 0 |
_aConstruction industry _x-- Costs _y-- Case studies. _934210 |
|
650 | 0 |
_aConstruction industry _x-- Cost control _y-- Case studies. _934211 |
|
700 | 1 |
_aAnkrah, Nii _934212 |
|
942 |
_2lcc _n0 _cBK |
||
999 |
_c15062 _d15062 |